London ’s Shard , the tallest building in the EU, and already one of the city’s greatest landmarks, is powered by a natural gas fuelled combined …
… contract. The GD-Suez company will optimise performance of The Shard ’s combined heat and power plant as well as ensure the building ….. the Burj Khalifa in Dubai, Western Europe’s tallest at The Shard and also the iconic 30 St. Mary’s Axe (The Gherkin) in …
… to be a great step forward for the capital city’s energy consumption.” Mace and Clarke previously collaborated on The Shard tower CHP project in London, where similar Jenbacher technology provides highly efficient on-site power and heat for the tallest …
… Jenbacher gas engines. Clarke Energy has provided engines for some of Britain’s most high-profile installations, including Guys & St Thomas’ Hospital, The Shard and King’s Cross Development. For more cogeneration business news Share
POWER-GEN AsiaBangkok, Thailand
+44 1992 656 600
1 September 2015
- 3 September 2015
|
|
44th Turbomachinery, 31st Pump SymposiaHouston, TX, USA
http://turbolab.tamu.edu/symposia/
14 September 2015
- 17 September 2015
|
Powered by: ![]()
Feasibility and preinvestment studies
11/07/2013
|
Gasification equipment
25/03/2013
|
Third-party finance
08/02/2013
|
Plant supervision, optimisation
07/08/2012
|
Energy audits
07/08/2012
|
Heat recovery steam generators
14/01/2009
|
Multisourced financing
04/12/2008
|
Data logging
28/05/2008
|
Cogeneration power plants - sterling engines
15/01/2008
|
Sterling engines
15/01/2008
|
Leisure, including swimming pools
28/08/2007
|
Switchgear
28/08/2007
|
Exhaust gas purification
28/08/2007
|
Fogging
24/07/2007
|
Gas turbine air inlet cooling
24/07/2007
|